Arrow © 2013 | Privacy Policy

Our Clients

PCS Solution in SAJCO

Deploy a Project Control System (PCS) using Oracle Primavera Solution (Primavera P6 EPPM) for the whole Enterprise Projects. This Consists of two phases; Phase-1: Enablement: through awareness workshops and training on a test environment and Phase-2: Implementation: through implementing the project control procedures on the Primavera P6 EPPM and Pilot on one project. Project Duration is 5-Month (June-2015 to Nov-2015)

Live Support